BID OPENING:
October 31, 2018 at 2:00 p.m.
City of Laguna Niguel
Public Works Department
30111 Crown Valley Parkway, SECOND FLOOR
Laguna Niguel, CA 92677
MANDATORY PRE-BID MEETING:
October 17, 2018 at 1:00 p.m.
Laguna Niguel Skate & Soccer Park
27745 Alicia Parkway
Laguna Niguel, CA 92677
See Project Specifications, Plans, and Details under “Related Documents” below
SCOPE OF WORK:
The general items of work to be done hereunder consist of: installation and maintenance of temporary erosion and sedimentation controls; demolition and disposal of existing infilled synthetic turf and infill materials; removal and replacement of existing edge anchor/nailer; removal, re-use of existing permeable aggregate base materials; import and placement of new permeable aggregate materials and finish grading of new and existing permeable aggregate surface; installation of infilled synthetic turf surfacing including tufted and inlaid lines and markings; removal and replacement of existing chain link fence fabric; furnish and install padding; clean-up and demobilization.
LOCATION OF WORK:
All work is located in the City of Laguna Niguel at Skate & Soccer Park, 27745 Alicia Parkway, Laguna Niguel, CA
The engineer’s estimate for the project is approximately $530,000.
THE USER IS RESPONSIBLE FOR CHECKING THE CITY WEBSITE FOR ANY UPDATES/ADDENDA. THE CITY WILL NOT TRACK USER DOWNLOADS.
… Read on
| Status | Open |
| Bid Category | Public Works Bids |
| Publication Date/Time | October 05, 2018, 12:00 AM |
| Closing Date/Time | October 31, 2018, 02:00 PM |
www.cityoflagunaniguel.org